Early-access preview · interactive
Explore the foundation, end to end.
Drag the knobs and click through every output — the parsed boring log, a 3D pile in the soil, capacity with its uncertainty band, the budget, the CSI-31 spec, and a buildable DXF — without leaving the page. This preview runs a sample Boston boring; live PDF upload arrives with early access.
Recommended element
7-inch micropile, rock-socketed
Shallow competent bedrock favours a small-diameter, rock-socketed micropile installable in low headroom.
Exploring sample boring B-1 · Seaport Tower — preliminary foundation screening. Live PDF upload arrives with early access.
- Allowable / element
- 108 kips
- P10–P90 66.5–149.5
- Group total
- 648 kips
- 6 elements
- Embedment
- 93 ft
- 7-inch micropile, rock-socketed
- Budgetary cost
- $172,047
- incl. 15% contingency
What-if · allowable capacity
108 kipsper element
Borehole log
Borehole log
B-1Seaport Tower — preliminary foundation screening
100 ft explored
Hover a stratum for its parameters. Preliminary design-assist — requires PE review and stamp.
Capacity vs depth
Allowable capacity vs depth
PreliminaryNE-calibrated static method (β/α skin + end bearing). Shaded region = P10–P90 uncertainty band (CoV ≈ 0.3); solid line = P50 median. Preliminary design-assist — requires PE review and stamp.
Preliminary design-assist — requires PE review and stamp. Earth Support Corp, or approved equal.