The jobs we have finished and the one we are on now, each with the ground we met and the quantities from the job’s own records. Representative tear sheets for other systems in Boston ground follow, marked as such. Filter by job, technique or place.

On site now

  • On site nowCambridge · Earth Support

    Soldier Pile & Lagging Wall, 44 Russell St

    Five new homes with basements are going in on a Cambridge lot, and the excavation runs along a side lot line with a three-story house about 3 ft beyond it. The ground is sand over soft marine clay, and groundwater sits 10–11 ft down, about at the bottom of the cut.

    Extent
    ≈ 68 lf, 18 piles
    Element
    HP12x53 in 24 in holes
    Follow the job
Show
Filter by technique
Filter by place

10 projects

  • 1234567
    On site now
    Earth SupportCambridge

    Soldier Pile & Lagging Wall, 44 Russell St

    Underway now: one lot-line wall, 18 soldier piles

    Read the case study
  • 1234567
    Completed· November 2026
    Earth SupportCambridge

    Property-Line Soldier Pile Walls, 194–196 Lakeview Ave

    Completed: four property-line walls, 22 soldier piles

    Read the case study
  • An excavation in front of a timber-lagged soldier pile wall, with the neighbor's chain-link fence and house directly behind it.Completed· October 2026
    Earth SupportCambridge

    Soldier Pile & Lagging Wall, 33 Thingvalla Ave

    Drilled, set and lagged in a single mobilization

    Read the case study
  • 12345678
    Completed· October 2026
    Drilled ShaftsActon, MA

    Rock-Socketed Piers for a Solar Carport, Acton

    11 piers drilled and poured, 9 of them socketed into rock

    Read the case study
  • A round concrete pier standing out of the ground with four threaded anchor rods capped in blue, on a graded site with more piers in a row behind and a wooded hillside beyond.Completed· September 2026
    Drilled ShaftsNorthborough, MA

    Drilled Piers for a Solar Carport, Northborough

    14 piers drilled and poured in September 2026

    Read the case study
  • A long cut face on a wooded hillside, faced in gray with rows of orange-capped soil nail heads.Awarded
    Soil NailingNewbury, NH

    Soil Nail Wall, 16 Edgemont Landing

    Subcontract executed 9 June 2026

    Read the case study
  • 123456
    Representative
    Earth SupportSeaport

    Soldier Pile & Tieback Shoring, Seaport

    Kept the foundation on the critical path

    Read the case study
  • 12345
    Representative
    AnchorsBack Bay

    Tieback Anchors for Retention, Back Bay

    Brace-free, open excavation for the GC

    Read the case study
  • 12345
    Representative
    UnderpinningCambridge

    Foundation Underpinning, Cambridge

    Existing structure stabilized for new loads

    Read the case study
  • 12345
    Representative
    Drilled ShaftsSomerville

    Rock-Socketed Drilled Shafts, Somerville

    High-capacity foundation to bedrock

    Read the case study

Where we work across Greater Boston

Deep-foundation work concentrated in Boston's fill-and-clay core and the surrounding cities. Select a neighborhood to focus the map.

Ready to scope your foundation?

Tell us about the project and we'll put together a detailed quote within 3 days. We generally work with general contractors.

Or email plans to bids@earthsupportcorp.com

CallEmailStart Quote